Brick up hollow bricks. Today, hollow blocks, or lightweight concrete blocks, are a very popular building material. As a do-it-yourselfer, you can coexist peacefully with it. Check out this article for important bricklaying tips.
Brick up hollow bricks. Hollow blocks for a range of uses
Hollow blocks can be used for many things, such as foundation stones for basement walls that are subsequently filled with concrete. They are often made of concrete or lightweight concrete. Clay or sand-lime brick can also be used to make hollow blocks.
Also read – Concrete hollow blocks
See also: Pumice slabs with hollow interiors
Also look at the costs of foundation stones.
Because the hollow blocks can be swiftly and simply cut in half or into three pieces with a mason’s axe, they are also straightforward to process and make ideal heat insulators due to their air chambers. The brickwork is quite simple.
Brick up hollow bricks. For a hollow block wall, step-by-step
- Empty blocks
- Mortar
- Plate bituminous
- Trowel
- Directive
- Level and measuring tape
- Reper
Brick up hollow bricks. 1. Get the base layer ready.
Brick-up, hollow blocks
Brick up hollow bricks. Blocks
You need to apply a layer of mortar, cover it with a layer of bituminous cardboard, and then apply another thick coating of mortar to keep the floor dry.
Brick up hollow bricks. 2. Set down the initial stone.
Level the first stone precisely with a level before placing it on the mortar bed. Next, extend the auxiliary line to serve as an escape line.
Place a coating of mortar on the head of the subsequent stone where it meets the preceding stone. Naturally, tongue-and-grooved stones have no mortar coating on their ends.
Brick up hollow bricks. 4. Construct brick walls around the stones
You may depend on a distinct wall structure composed of guides and girders, depending on the necessary load-bearing capability.
The trusses are stones built across the wall, while the guides are stones running the length of the wall. A distinct wall bond is produced based on the runners and girder layout.
5. Take steps to prepare for a more accurate escape
The individual rows in front of them should always be bricked, much like steps, to help you keep alignment more precisely. Ensure that the mortar joint is as near to one centimeter as feasible.
ADVICE & SECRETS
When it comes to hollow blocks, the stone’s height is always fixed, meaning that four rows of stones with a mortar layer will always result in a wall height of precisely one meter. This facilitates wall planning.
How to clean concrete blocks?
You definitely can’t use caustic cleaning agents. In our product range, you will find an innovative preparation for cleaning concrete surfaces, BETOFF-B. It is very effective in removing stubborn dirt, grease, oil stains, moss, and other dirt. 100% biodegradable!